Skip to content
AFINISHES
01 Delivered project

Bahria Town Tower

Lehr 3D concrete tile, cast at the Karachi works and fixed by our own crew. A relief tile on a tower plane earns its keep on the shadow it throws, and that shadow only reads if the depth and the pigment repeat across the whole elevation, so the tiles were cast off one mould set and batched by pour. The crew set the hexagonal grid out on site so the pattern closes cleanly at the reveals.

Location
Karachi
Material
Lehr 3D concrete tile
Category
3D wall tiles
02 Photographs

Project photographs

Every image in this record belongs to Bahria Town Tower.

  1. Installer fixing hexagonal 3D concrete wall tiles at Bahria Town Tower
    Photograph 1 of 1Installer fixing hexagonal 3D concrete wall tiles at Bahria Town Tower
03 Next

Specify this finish for your project

Send the drawing, area and finish requirement. We will come back with samples and a quote.